ALL ENGINEERS WORKING @ MEAD YARD

Brothers and Sisters,

If you are working at mead yard as either an extra board engineer or regular assigned engineer. please submit a claim for a basic days pay each time you are required to report for duty. Section 13 article 33 of our 1982 SPWL CBA requires

*Wash room and change room facilities

*Lockers

*Showers

*Hot water

*Tables and chairs

mead 4 mead 3 mead 2 mead 1

how to write the claim

on (date)Claiming 100 Miles account No Shower/hot water /chairs provided at on duty/off duty point. This is a violation of the SPWL 1982 Agreement, Article 33 Section 13 which states: at terminals specified in section 1, art. 13, the company will provide wash and change room facilities, including lockers for clothes, showers, hot water and tables and chairs so that required reports may be made out and answered. These facilities will be maintained in usable condition and cleaned at least once a day.

ARTICLE 33, SECTION 13

SECTION 13. At terminals specified in Section 1, Article 13, the Company will provide wash and change room facilities, including lockers for clothes, showers, hot water and tables and chairs so that required reports may be made out and Company correspondence answered. These facilities will be maintained in usable condition.

Advertisement

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s