Please download and keep on your person. We have had a couple of decertifications on account of crew members being unfamilar with their location and or territory.
It has come to my attention that UP LA Service Unit managers are
Testing for Superintendent bulletin #14. You Must have a paper copy.
please download and put in your grip. click on the red link below
LOS ANGELES SUPERINTENDENT BULLETIN NO. – 14
PURPOSE:
4-SECUREMENT OF EQUIPMENT-YUMA YARD SECUREMENT INFORMATION ADDED EFFECTIVE DATE: 1523, January 11, 2017 CANCELLATION DATE: 2359, December 31, 2017 CANCELLATIONS: Bulletin #4 SECTION: A SUBJECT: SECUREMENT REQUIREMENTS ON THE LOS ANGELES SERVICE UNIT
Each TE&Y employee must have a paper copy of this bulletin while on duty.
JOB BRIEFING BOOK When securing equipment to be left unattended, each member of the crew must make an entry in his or her Job Briefing book….
when you are called from the Jp016 xe10 for anything other than patching a jp016 re31/re21 train(must have a corresponding id)you are entitled to a basin rate of pay, not a de10 rate.if you are however patching a re31 train its ot after 8 or mileage.below I have put in the parameters of that claim. and if you are called for a long pool train id , but work something else you are entitled to the flat rate.
remember its the work you performed,not the service you were called for
CLAIMING THE BASIN FLAT RATE OF PAY $504.05. WAS CALLED TO WORK –TRAIN ID-ON –DATE– OFF OF THE –BOARD– . WAS PAID INCORRECTLY AT THE 130 MILE SCHEDULE. PER, LA HUB AGREEMENT SECTION 6 AGREEMENT COVERAGE, PART B IN ARTICLE 3 SECTION 5 (B)….MADE UP ASSIGNMENTS AND/OR EXTRA ASSIGNMENTS CALLED TO OPERATE WITHIN THE SCOPE OF THIS AGREEMENT WILL QUALIFY FOR THE TRIP RATE CREATED BY THIS AGREEMENT. PLEASE PAY $504.05 FOR-TRAIN ID-ON –DATE–
Please see Item # 5. Now see the LA Hub Implementing Agreement: B. General Conditions for Pool/Assigned Operation in Article III.
d. Pool engineers shall be paid in accordance with ps 1,2,5, and 6 of the flat rate road switcher agreement effective September 16, 1996. The flat rate for these assignments shall be $300.00/engineer. These payments shall be inclusive of any payments for not stopping to eat. When given a call and release, the call and release rules shall apply for engineers in this pool in lieu of the flat rate.
“Made up assignments and/or extra assignments called to operate within the scope of this agreement will qualify for the trip rate created by this agreement.”
Please be aware when building trains or switching with road power. This is a easy failure for the company.
Due to a derailment we had on December 6th the company has added switching restrictions that limit power to 24 axles when switching and or building trains with road power
Los Angeles Superintendent Bulletin No. – 114
Section: J Subject: Switching or Shoving with Road or Hauler power
When making a Shove or Switching move always comply with the requirements of rule 34.2.11 & 34.2.12 which requires using the lowest throttle
position possible to avoid jackknifing, wheel climb or rail turnover” and “when switching with multiple locomotives care must be taken to limit buff
and draft forces. On the Los Angeles Service Unit when switching, shoving or spotting a ramp with road or hauler power to a maximum of 24 axles online. If you are in a situation that requires additional axles you must have a job briefing and approval and from a DSLE.
You must be logged in to post a comment.